Road reconstruction projects in Fort Nelson

We designed and managed construction contracts for over 3km of roading, including stormwater collection, sidewalk repairs and curbing.

The projects included residential, commercial and industrial roads:

 

  • Approximately 980m of residential road reconstruction, including removal of existing road gravels, installation of underground stormwater collection, replacement of road gravels, new curb and gutter, and new asphalt
  • Approximately 460m of commercial road surface improvements, including milling of existing asphalt, drainage improvements, curb/sidewalk repairs and asphalt overlay
  • Final grading, paving and shouldering of approximately 1725m of industrial roads