Supply and installation of a generator and an automatic transfer switch

The work also included construction of a concrete pad for the generator, a fuel tank and site work improvements.

In order to back up the operation of both pumps, the generator was sized to 40kW. The generator was supplied with an all weather and sound attenuation enclosure.

Parkwood Construction Ltd was the contractor for this job. The system was commissioned in August 2009 and provides backup power to the station.